Data Centre Construction
Patient transport and treatment for large construction campuses, ready the day the site opens.
Data centre campuses put hundreds, sometimes thousands, of trades on site at once, and many new campuses are being built in rural areas far from EMS. On a site that size, getting an injured worker from the far end of the campus to care is a real problem.
A Code Three Mobile Treatment Centre gives your on-site medic a certified response and transport unit on a standard pickup. It reaches the work across mud, gravel and haul roads, then carries the patient to your clinic or to EMS.

Why large campuses need their own transport
- Very large workforces and multiple contractors on one site
- Rural locations with longer EMS response times
- Unfinished ground: mud, gravel, laydown yards and haul roads
- Tight schedules where every lost-time incident hurts
How the Code Three MTC helps
- Built for the medic: dual stretcher capability, 72" of headroom, oxygen and medical storage
- Goes where a highway ambulance can't, on any standard full-size pickup
- CMVSS certified Emergency Transport Vehicle and CSA certified
- Quick to deploy and easy to move between projects as phases finish
Frequently asked questions
Who usually buys an MTC for a data centre project?
Usually the general contractor or the medical services company running the site clinic. We work with both.
Is the MTC available outside Canada?
Our MTCs are certified for Canada. For projects in the United States, contact us to discuss availability and requirements.
How fast can we get one?
Delivery in Ontario typically takes 4 to 6 weeks. Contact us for timing to other locations.
Plan your site's emergency transport
Tell us where and when you're working. We'll recommend a configuration and give you a delivery date.
